Engineering & Capability

Every fixture is drawn, tested and packed before it leaves the workshop

Custom lighting works only when engineering and craftsmanship line up. Here is what happens to your order — from concept sketch to the day the cases leave the factory floor.

What backs every order

Seven checkpoints. One point of contact.

Nothing gets packed until it has passed through all seven stages. Each stage produces a document or photo that we share with you — so the project team knows the exact state of the order, not just a promise.

  • CAD drawing of the fixture in its target space
  • 3D visualisation for colour, scale and material confirmation
  • Pre-production sample — visual + electrical check
  • Weekly reporting with high-resolution photos and video
  • Full pre-assembly in the workshop, position-marked
  • Export packaging in fumigated timber cases
  • Installation support with online technical guidance

What we are equipped to deliver

Fixtures by size

  • Single signature pieces to 4 m drop
  • Tiered crystal chandeliers up to Ø 3 m
  • Linear pendants up to 6 m span
  • Full ballroom lobby packages

Materials in selection

  • High-lead crystal, specified grade per project
  • Hand-blown glass, colour-matched
  • Natural alabaster, block-selected per order
  • Six metal finishes from polished brass to matte black

Electrical & safety

  • 220–240V standard / 110V available
  • CE-listed components as standard
  • UL-listed components on request
  • RoHS compliant across all ranges

Export destinations served

  • FCL / LCL sea freight to all major ports
  • Air freight for time-sensitive orders
  • DHL / FedEx / TNT door-to-door
  • IPPC fumigated timber cases
Chandelier pre-assembly on a workshop table with position markers
Quality Checkpoints

Checked where the cost of error is still low

  • Material inspection before assembly. Crystal grade, glass tone and brass finish batch-matched against the approved sample.
  • Electrical test per fixture. Voltage, current, light colour temperature — every fixture is powered and measured, not just visually inspected.
  • Light-colour check. Every batch is measured against the colour-temperature reference on the approved sample — no "close enough".
  • Full pre-assembly and position marking. The complete fixture is assembled in the workshop. Every pendant and its matching lock position on the canopy or ceiling is marked for site.
  • Packing photographed before sealing. For your reference and freight insurance — you can see exactly what was inside the case when it left.

Design to installation — 8 stages

  1. 01
    Concept brief → reference photos, dimensions, ceiling type
  2. 02
    CAD drawings + 3D visualisation → locked before production
  3. 03
    Material sample approval → colour, finish and crystal grade
  4. 04
    Pre-production sample → visual + electrical check
  5. 05
    Weekly production reporting → photos + video
  6. 06
    Full pre-assembly + position marking
  7. 07
    Export packing → IPPC timber cases, photographed before seal
  8. 08
    Customs clearance + delivery → FOB / CIF / DDP

Send us your sketch or reference photo — we reply within 24 h

Start your inquiry
Start a project

Tell us about your lighting project

Share your drawings, quantities and finish requirements — our team will reply with a proposal.

Request a Quote Reply within 1 business day